Buster's Backyard - Delft3D Hydraulic Model Lab

In this lab we want to build proficiency in the development and application of a 2D hydraulic model spanning inception of study, the collection of field data, the construction of the model (not the code), running the model, and finally the evaluation and interpretation of the results. We will take two or three weeks to get through all these steps.

Total Station Surveying on the Blacksmith
Fork River. For full album, see here.